By allocating each measure a cost and a benefit as described in How did we assign benefits to the measures? and How did we cost the measures? we produced a cost v benefit matrix of measures for two industrial scenarios.
Industrial cost vs benefit matrix - factory units (f) and warehouse units (w)
Move your cursor over the measures to access more information about the measures.
IT MUST BE REMEMBERED THAT THE MATRIX IS TO BE USED AS A DISCUSSION TOOL AND IS INDICATIVE ONLY.
|